Contact
Home page
 Thermal
Brindisi  
Chivasso  
Piacenza  
Sermide  
S.Filippo del Mela  
Turbigo  
 
 Hydroelectric
Mese  
Tusciano  
Udine  
 

 


PRESENTATION

This section includes an information sheet for each plant, complete with the history, technical data and the projects (under way and future) relevant to environmental protection systems and revamping/repowering, as well as an animated diagram representative of the operation process.

At December 31, 2008, the gross operating capacity of these facilities was 7,630 MW.

|   P.I. 13442230150

 

Home page